North east side ,east side & south east side of basement concrete floor poured. So one third of the total basement floor is poured . Shows elevator shaft to the upper left side of image . Shows tracks & ramp used by the bucket machine , to move concrete into the flooring area to be dumped and leveled off and then troweled by the concrete masons.