Testing basement water line and valves for leaks ,under high air pressure for leaks in the water line system . Notice all the white and black buckets stacked up on the floor at the end of the water line and the green garden hose and the dark water spot on the floor .
Second floor , installing steel studding for dividing off offices . Also insulation being installed in ceiling at One Blue Bird Square .
East inside roof area , looking up at sky lights , steel studs and sheet rock that was installed so far .on first and second floors .
East first floor, installing aluminum insulation on steel studs . Shows drain pipe and scaffold .
Shows northeast side of elevator cement block housing structure , to get steel studs on cement block wall and then apply sheet rock , then tape the joints where the sheet rock joints come together to cover cracks and apply adhesive coating over the tape,then sand smooth , prime and paint .
North east front erecting steel studding toward the roof . Scaffolds,a sign in the wood crate waiting to be hung and other construction building supplies about .
Northwest entrance orange plastic film covering entrance to the outside of One Blue Bird Square and steel studding erected to frame in door way area to bus passengers waiting room ,also see white drainage pipe from ceiling thru base of first floor to basement .
North Union street One Blue Bird Square, east front . Coming along nicely
Southeast front shows plate glass laid up against east planter and saw horses on front sidewalk and other construction wood .
Testing basement water valves with air and water for leaks in the system that is installed so far .