West Lauren street looking South East at the North side of temporary enclosure for work being done inside and behind it. Also look at West side enclosure of blue tarp covering both first floor and second floor west . North West entrance exposed, for entering B.B.S.
Christmas decoration’s over North Union street .Scaffold set in place for a working platform ,for work being done on the east side of building The plywood at the base of the scaffold is a temporary shield to help contain falling debris from above .
North side of B.B.S.shows scaffold’s set up and plywood being applied to upper side of over hang. North West view above entrance to waiting area, black coating is being applied over the top of plywood sheeting on roof over hang . View South of West Lauren street at B.B.S.,.
North West view . This is where the passengers load and unload from other destinations to and from One Blue Bird Square, Olean,N.Y. The view here is the passenger entrance to the ticket office and waiting area just to the right of West Lauren street .
First floor sewer and drain lines being fitted and put in place
B.B.S. basement steel studs and sewer and drain lines in a few rooms
Basement valves photo 177 shows valves water lines being fitted together . Photo 178 shows water lines and vales being fitted and assembled together to form the water system that will be operational , this shows the fresh water system in the basement at B.B.S. complete . The four 6″ x 16 ” cement blocks under the water valve was used while the water valve is bolted together with the other valves and lines .
The Famous Blue Bird Bus lines,at One Blue Bird Square,Olean,N.Y.14760 Volume 1 . Basement installing water lines and water valves . Many more photos yet to be published .
Starting temporary enclose,r on eastern end of the building. So that cold weather work can be done in side the enclose,r .
A pile of sheet rock stacked on floor area. Starting to hang sheet rock on the inside eastern part of the building .